As the “TEM North-South Side-road Construction Work” conducted by the İstanbul Municipality next to our main entrance gate has not been completed yet, entrances to and exits from our School are arranged as below, as of 07.09.2018 until the construction finishes, through the numbered gates as indicated on the attached maps;
• Only entrances through gate number 2
• Only exits through gate number 1
You can find attached the maps containing the routes that will be used to enter end exit the School.
Students’ departure and drop-off locations remain the same.
Not: Exits from gate number 2 and entrances from gate number 1 are not allowed.